High Speed Grain Unloading, Storage and Shipping Facility

Project:     High Speed Grain Unloading, Storage and Shipping Facility

Client:       Saskatchewan Wheat Pool (Cargill Ltd.)

Location:   North Vancouver, British Columbia, Canada

Saskatchewan Wheat Pool (Cargill Ltd.) -- North Vancouver, British Columbia

CMC Engineering and Management Ltd. was retained by Saskatchewan Wheat Pool to provide a Feasibility Study for a high speed grain unloading, storage and shipping facility for Roberts Bank, Delta, British Columbia.

The concept was to unload a unit train of 112 cars in one 8 hour shift and to load at 2,500 tonnes per hour with a surge storage of 80,000 tonnes.